A1 motorway, known as the Nation's Highway in Albania is part of the Durrës-Kukes Corridor referring to the road segments between Milot, Rrëshen, and Kalimash. Remaining segments between Kolsh, Kukës, and Morinë are part of the SH5 Highway instead linking Shkodër and Kukës. It is unclear whether the segment Thumane-Milot is part of the A1 or SH1 as road signs and map markings do not officially coincide. In June 2009, the project was symbolically inaugurated with opening of the Kalimash - Thirrë Tunnel, while the whole project was only finished by July 2010 and the remaining portions by summer 2011. However, segment Milot-Rrëshen and several viaducts on the SH5 still remain to be expanded into dual carriageways in the near future. It is expected that the motorway will become a toll highway to upgrade remaining segments to full motorway standard and cover the costs of maintenance. The highway is expected to reduce the travel time from six hours to two, with an estimated speed of 80–110 km/h. The highway is also expected to boost tourism in Albania and deepen the cultural and economic exchanges between Albania and Kosovo. As most tourists come through Kosovo, the laying of the highway will make it easier to travel to the Durrës and Shengjin ports, and the Adriatic Sea generally. ==Rrëshen - Kalimash== The most challenging part of the corridor was the segment between Rrëshen and Kalimash, which is around 61 km long. It was divided into three sections - a 19 km stretch from Rrëshen to Reps, 27 km from Reps to Thirrë and 15 km between Thirrë and Kolshi. A total of one tunnel and 27 viaducts have been constructed through the steep and mountainous terrain. There are 17 viaducts in the area from Reps to Thirrë. The use of a hydro-powered electricity grid instead of diesel generators has helped in reducing the carbon footprint of the project. As a result, CO2 emissions have dropped by each month. The above segment as opposed to the other ones is of a higher quality both for security and construction parameters. Construction work on the remaining segments in Albania (Milot-Rrëshen and Kalimash-Morinë) finished in 2009. Even though in double carriageway standard, Kolsh-Morinë (SH5) lacks the standard of A1 as entry and exit ramps are missing. The viaducts along this segment will be doubled in the near future while uncontrolled entry and exit points are becoming a major safety issue. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「A1 Motorway (Albania)」の詳細全文を読む スポンサード リンク
|